Doval have completed many projects for a wide variety of organisations including Queensland Rail, Brisbane City Council and other Government organisations. Please click here for details on some of our previous projects..

PROJECT EXAMPLES

An overview and photographs of recent projects can be seen below.

Job Title: Sunnybank Station Upgrade
Client: Queensland Rail
Description: Complete overhaul of existing rail station, building, platforms, and carparks including realignment of rail crossing and interleading road accesses. Construction of a third track and platform with disabled access via new lifts and footbridges to all platforms.
Related Photos
 
 
 
 
Liftshaft #2 construction alongside operating track Liftshaft #3 pier and headstock construction  

 

Job Title: Merrimac pump station
Client: Tenex
Description: Construction of sewerage pump station. Due to a wet environment pump stations was constructed as a caisson, excavated internally and sunk progressively.
Related Photos
 
View into Caisson pour no 7
Caisson excavation 30/5/07
Grout curtain installation 16/3/07 Ring beam 27/2/07 Curtain cutting edge pour 8/2/07
     

 

COMPLETED

Job Title: Caloundra pump stations
Client: Calqua
Description: Upgrade and construction of two sewerage pump stations. New facilities were constructed alongside existing operational units. Due to restricted access, wet environment and existing services both pump stations were constructed as caissons excavated internally and sunk progressively.
Related Photos
 
 
 
Formwork and steelfixing prior to excavation Excavation of caisson with clamshell extendable boom Final preparation of caisson floor prior to sealing with floorplug

 

Job Title: Corinda Station Upgrade
Client: Queensland Rail
Description: The Corinda Station Upgrade contract consists of introducing 4 lifts and other changes to make the Station fully compliant with the Disabled Access Norms as per the Australians Standard Specifications.
Related Photos
Old Access ramp has been removed and new lifts No 2 & No 3 construction in progress
New lift shaft No 4 under construction
Foreground: Lift shaft # 3 foundation in progress. Background: Lift shaft # 4 in progress. Existing access ramp will remain.
New lift # 1 introduced on Browne Street. Shaft construction in progress. Existing ramps will remain
Foundation works for new staircase in progress. Ramp above will be demolished & replaced by new staircase.


Job Title: Hope Island Resort Internal Bridge Works
Client: Hope Island Resort Holdings Pty Ltd

Description:

Doval Constructions has been awarded the contract to construct 3 bridges on Hope Island Road (A.K.A. Oxenford-Southport Road) between Gracemere drive and Santa Barbara Rd at the Gold Coast Suburb of Hope Island, referred to as the Grand Canal South Bridges.

Two of the bridges are to be dual lane bridges, complete with footpaths and guardrails as well as footpaths / golf buggy paths running below the bridge alongside the river. A third bridge, owned by Hope Island resort Holdings is to be constructed alongside these 2 bridges and will be for the exclusive use of the residents of the new surrounding estates.

The bridges are concrete construction consisting of 3 spans of prestressed precast deck beams. The foundations consist of 14m long driven piles supporting abutment pilecaps and retaining walls as well as pier pilecaps supporting pylons and headstocks. Relieving slabs provide connection to the adjoining roads.

The bridge will connect an internal body of water to the Coomera river which will provide all the residents of that waterway with access to the Broadwater via the Coomera river.

The end result of this construction will increase Hope Island Road carrying capacity from the current single lane road to dual lane highways in each direction.

Related Photos
 
Completed
Completed

Westbound Carriageway Western abutment die view.
Westbound Carriageway Western Pier columns with formwork in position ready for concrete pour.
estbound Carriageway Western abutment complete showing the recess for the services corridor.
Westbound Carriageway Eastern abutment formwork preparation
Westbound Carriageway Eastern pier columns with steel tied and ready for formwork
Hope Island Resort Internal bridge view of the Eastern abutment footing
Hope Island Resort Internal bridge view of the site
Westbound Carriageway with beams in place and perimeter wall partly complete.
Westbound Carriageway elevated view looking westwards of the abutment formwork being prepared.
 
  Westbound Carriageway elevated view looking westwards of the abutment formwork being prepared. Westbound Carriageway view of Eastern abutment and pier columns